Friday, October 20, 2006

On the left side of this picture there is a section of 2x4s that we found just a few steps inside the front door of the building... We want to keep this area open so this isn't what we wanted to find behind the drywall...
It's starting to open up inside. Posted by Picasa
It didn't take long to fill up the dumpster! Posted by Picasa

Sunday, October 15, 2006


Circa 1890 Posted by Picasa

Friday, October 13, 2006


demo 13 Posted by Picasa

demo 12 Posted by Picasa

Demo 11 Posted by Picasa

View from apartment to the left of the front door. Posted by Picasa

More demolition... Posted by Picasa

Lots of insulation in the crawl space between 1st and 2nd floors. Posted by Picasa

1st floor ceiling... Posted by Picasa

More 1st floor ceiling... Posted by Picasa

checking out the 1st floor ceiling Posted by Picasa

demo 10 Posted by Picasa

demo 9 Posted by Picasa

demo 8 Posted by Picasa

demo 7 Posted by Picasa

demo 6 Posted by Picasa

demo 5 Posted by Picasa

demo 3 Posted by Picasa